Construction management Q&A
How do I record CIDB-graded subcontractors on site?
Short answer
- Before work starts, ask each subcontractor for the registration details your client or contract requires, then add the company to your list of subcontractors with the trade and contact details.
- Allocate the subcontractor to the site and to the specific stage, so a foreman in Midrand can see at a glance who is meant to be on the formwork and who on the plumbing.
- Create one document reference per proof, such as a registration letter or a signed appointment, attach the single file and note the date, since each reference holds only one attachment.
- Record daily who actually arrived in the diary team field, so any gap between who was appointed and who worked is visible and dated.
- Review your list before each new phase, and confirm any grading or registration questions with the Construction Industry Development Board or your client rather than relying on an old copy.
Regulations and references
- The Construction Industry Development Board (CIDB) maintains the register of contractors and assigns grades. Check the current grading and registration requirements for your project type directly with the CIDB or your client before you appoint anyone.
Practical example
- Example: a developer in Johannesburg appoints a civil subcontractor and an electrician for a small warehouse. Each is added with allocations to different stages, and their appointment letters are attached as separate document references.
- Example: a contractor in Ekurhuleni finds that a second crew arrived on site without being listed. The diary shows the extra team on Tuesday, which prompts a quick call and an updated allocation instead of a surprise on the invoice.
- Example: a project manager in Tshwane prepares for a client visit and opens the document references for each subcontractor, confirming that every attached file is a PDF or photo within the twenty megabyte limit.
Common mistakes
- Collecting registration papers once at the start of a long job and never looking at them again, even when a different company or crew replaces the original.
- Saving a scan on a personal phone instead of attaching it to the right document reference, so nobody else can find it when the client asks.
- Assuming the platform verifies a grading or registration, when it only stores the reference and file that you add yourself.
How 4construct helps
- 4construct keeps your subcontractor list, stage allocations, daily team notes and document references with one attached file each. It does not check registers, verify grades or manage document versions, so the checking itself is something you do with the issuing body.