Construction management Q&A
How do I allocate LBPs to restricted building work?
Short answer
- Add each licensed building practitioner or their firm as a subcontractor on the site, and put the licence class or the type of restricted work in the name or the notes so it is easy to see.
- Allocate the practitioner only to the stages they actually carry out or supervise, for example framing, roofing or exterior cladding, rather than to the whole site by default.
- If a practitioner leaves the job, end their allocation on the date and allocate the new practitioner from that point, so the diary shows who was responsible for what and when.
- Add a document reference for each record of building work when you receive it, attach the one PDF, and say in the title which stage and practitioner it covers.
- Before the final stage, list stages with restricted work and check that each has an allocated practitioner and a matching document reference. Chase any missing paper straight away.
Regulations and references
- Under the Building Act 2004, restricted building work must be carried out or supervised by a licensed building practitioner, who provides a record of building work when finished. MBIE explains the rules at building.govt.nz; confirm details for your job with your council.
Practical example
- Example: a new house in Tauranga with a framing practitioner and a separate roofing practitioner. The builder allocates each to their own stage and files two document references, one record of building work per practitioner.
- Example: a renovation in Nelson where the first carpenter leaves after the frame. The allocation is ended on that date, the replacement is allocated to lining and finishing, and each hands over their own record.
- Example: a villa extension in Dunedin. The owner asks who did the weathertightness details, and the stage list shows the practitioner and the document reference, which saves hunting through emails.
Common mistakes
- Allocating a practitioner to everything because it is quicker. A clean allocation per stage is what makes the record useful later.
- Storing several records in one scanned file. Each document reference holds a single attachment, so split them first.
- Believing the software checks that a person is licensed. It does not; verify licences with the official register yourself.
How 4construct helps
- 4construct records subcontractors, their allocations to sites and stages, and document references with one attached file each.
- It does not verify licences, sign records or manage document versions, and it does not file anything with the council. Those steps stay with you and your practitioners.