Teikningar-honnunargogn-verkstad-skjol

Construction management Q&A

Where do I keep approved drawings for an Icelandic site?

Short answer

  1. Collect the approved design documents (hönnunargögn) for each work item, such as architectural, structural and installation drawings, before the work on that item begins.
  2. In the site, add a document reference for each drawing and write a clear title with the discipline and date, for example “Structural drawing, first floor slab, March”.
  3. Attach one file to each reference: PDF, JPG, PNG, WEBP or HEIC, up to 20 MB. For a larger set, split it into several references or reduce the file before you upload it.
  4. Tell the foreman which reference is the one in force. When a drawing is replaced, add a new reference with the new date and say in the log which reference replaces the old one.
  5. Check the references before each phase inspection, so that you know what to show the inspector and can see that nothing is missing for the stage.

Regulations and references

  • According to the City of Reykjavík’s guidance, the byggingarstjóri must see that the approved design documents for each work item are on site before the work on it starts. Confirm the current requirement with your byggingarfulltrúi.

Practical example

  • Example: a house in Reykjanesbær has twelve drawings. The site manager creates twelve document references, each with a PDF, and the carpenters know to read the title with the date before they start framing.
  • Example: the engineer sends a corrected reinforcement drawing for a slab in Reykjavík. The site manager adds a new reference, notes in the log the old one is replaced, and the crew uses only the new file.
  • Example: a foreman photographs a handwritten site sketch with a phone, as a HEIC file under 20 MB, and attaches it to a reference called “Pipe routing, bathroom, as built”.

Common mistakes

  • Working from a drawing that has been replaced because the new one lives only in an email. The reference list should always say which one is in force.
  • Uploading a huge scan of the whole drawing book as one file. Split it up into references that match the work items, so people can find the page they need.
  • Believing that the system manages versions. A reference holds one file; versioning is your own discipline, supported by titles, dates and log entries.

How 4construct helps

  • 4construct stores references to documents, each with one attached file, and keeps them next to the site and its log. It does not manage document versions, signatures or certification, and it has no client portal, so approvals stay in your own process.
4b2b.net
Business Ecosystem
4conta.ro
Accounting
4invoices.net
Invoicing App
4expenses.net
Expense Management
4notify.net
Notifications
4hosting.net
Hosting
4database.net
Databases
4buildsite.net
Website Builder
4myapp.net
App Builder
4avatars.net
AI Avatars
4chaty.net
AI Chatbot
4webagency.net
Web Agency Software
4softedu.net
Education Websites
4softcrm.net
CRM Platform
4softerp.net
ERP System
4softhr.net
HR Management
4mystaff.net
Staff Portal
4construct.net
Construction Companies
4mycontracts.net
Contracts
4docs.net
Document Management
4appointments.net
Appointments
4marketingonline.net
Marketing
4insurance.net
Insurance
4property.net
Real Estate
4lawyers.net
Legal Software
4mygarage.net
Auto Service
4driving.net
Driving Schools
4fleet.net
Fleet Management
4myevents.net
Events
4therapy.net
Therapy
4clinics.net
Clinics
4dental.net
Dental Practices
4restaurants.net
Restaurants
4beautify.net
Beauty Salon
4gym.net
Fitness Gyms
4guards.net
Security Companies
4softvet.net
Veterinary Clinics
4softauto.net
Automotive Business Software
4marketplace.net
Marketplace
4shopy.net
Online Store
4pricing.net
Price Comparison
4salefood.net
Food Delivery
4rentify.net
Rentals
4transports.net
Transport
4agencytravel.net
Travel Agency
4hotel.net
Hotel Management
4ong.net
NGO Management