Construction management Q&A
How do I work out the real cost per square metre of a build?
Short answer
- Choose the relevant area and define what it includes so comparisons use the same basis.
- Add costs for the included work and list excluded or unconfirmed costs separately.
- Divide the total by the area and update the calculation as new costs arise. Costs can be recorded in 4construct; calculate cost per square metre separately.
Practical examples
- Example: €250,000 of included costs over 1,000 m² equals €250/m²; the result changes if the area basis or included costs differ.
Common mistakes
- Do not compare gross and usable floor area without stating the difference.
How 4construct helps
- Enter costs manually by site and category and review totals available in your plan.
- Keep the area and cost-per-square-metre calculation separately; currencies are not converted automatically.