How do I plan crews and equipment across several sites at once?
Short answer
- List available crews and equipment, time periods and the sites that need them.
- Compare demand with availability manually and set priorities when periods overlap.
- Review the plan when deadlines change. 4construct records sites, stages and subcontractor assignments; it does not automatically track equipment or crew capacity.
Practical examples
- Example: if two sites need the same crane on one day, compare durations and reschedule one job after confirming availability.
Common mistakes
- Do not assign one resource to two places at the same time without checking travel and duration.
How 4construct helps
- Review sites and stages and assign subcontractors to a site or stage.
- Scheduling your own crews, availability and equipment tracking require a separate record.